Integrated Cost and Schedule Control in Project Management
Management Concepts, Inc (Verlag)
978-1-56726-170-7 (ISBN)
- Titel erscheint in neuer Auflage
- Artikel merken
Integrated Cost and Schedule Control in Project Management provides easy-to-understand explanations about the tasks and techniques that accompany this sometimes daunting practice. New and experienced project managers will benefit from this straightforward guide and be able to:
• Perform requirements analysis and develop a deliverable breakdown
• Identify work packages and develop a work breakdown structure (WBS)
• Negotiate project scope based on limited budget and/or resources
• Establish an integrated cost/schedule performance measurement baseline
• Establish a change management process
• Apply earned value analysis techniques to identify project issues
• Establish project control charts with status indicators
• Take proactive corrective action to keep the project in control
You'll also benefit from extensive examples and case studies that illustrate integrated cost and schedule control techniques - making it easy for you to apply them to your own projects!
Ursula Kuehn, PMP, is a member of Mensa USA and president of UQN and Associates, Inc. She has been a certified Project Management Professional since 1995 and a consultant/trainer to government agencies and commercial corporations in various aspects of project management. She has a strong background in operations research and mathematics, and specializes in integrated cost and schedule control and earned value management system procedures. Her educational accomplishments have earned her an MS in operations research from the George Washington University (GWU), a Masters Certificate in project management from GWU, and a BS in mathematics from Bowling Green University.
Introduction to Project Management and the Integrated Process * The Integrated Process * Defining the Scope * Estimating the Cost and Duration of Work Packages * Balancing the Scope to the Budget * Understanding the Workflow and How Work Packages Relate * Building a Network Schedule * Analyzing and Adjusting the Schedule * Analyzing Schedule Risk * Readdressing the Scope to Balance the Triple Constraint * Establishing a Performance Measurement Baseline * Performing Earned Value Analysis * The Closeout Process * Analyzing the Cost and Schedule Metrics of Deliverables * Archiving Cost and Schedule Data for Continuous Process Improvement
Erscheint lt. Verlag | 5.6.2006 |
---|---|
Verlagsort | Vienna |
Sprache | englisch |
Maße | 156 x 234 mm |
Themenwelt | Wirtschaft ► Betriebswirtschaft / Management ► Projektmanagement |
ISBN-10 | 1-56726-170-1 / 1567261701 |
ISBN-13 | 978-1-56726-170-7 / 9781567261707 |
Zustand | Neuware |
Informationen gemäß Produktsicherheitsverordnung (GPSR) | |
Haben Sie eine Frage zum Produkt? |
aus dem Bereich