Nicht aus der Schweiz? Besuchen Sie lehmanns.de
Process Downtime Reduction - Michael R. Beauregard

Process Downtime Reduction

How to Minimize Waste from Breakdowns, Set-Ups, Supply Chain Issues, and Staffing Constraints
Buch | Softcover
154 Seiten
2023
Productivity Press (Verlag)
978-1-032-44548-9 (ISBN)
CHF 59,30 inkl. MwSt
This book gives readers the techniques they crucially need to keep their critical manufacturing equipment running correctly and efficiently, which increases production, decreases labor costs, decreases breakdown costs, and ultimately increases the bottom line.
Among the biggest mistakes manufacturers make is not keeping key equipment and processes running and making saleable product when needed. This situation existed when the author Mike Beauregard began working in manufacturing years ago and it currently remains true in companies ostensibly focusing on Lean. To improve, companies often rely on increasing productivity by making products faster and with more automation, but many fail to focus on the area in which they can get the biggest gains for their efforts – the reduction of downtime.

This book provides readers the techniques they crucially need to keep their critical manufacturing equipment running correctly and efficiently – which increases production, decreases labor costs, decreases breakdown costs, and ultimately increases the bottom line. Downtime in production lines stems from many sources. The contribution might be small for many of those sources, but it adds up.

Downtime and its causes then insidiously become the norm, accepted, unseen by the workforce and the management team. Most training courses and books look at a specific cause of downtime – mainly, either product changeover (set-up reduction) or breakdowns (TPM). This book addresses these two areas and many other sources of downtime including how to decrease downtime caused by supply chain issues, staffing issues, and downtime internal to the processes themselves.

In the final chapter, the author covers how to manage the downtime reduction effort – how to measure downtime, prioritize which downtime sources to attack first, and monitor the improvement.

Mike Beauregard is the founder of Resource Engineering Consulting LLC, a consulting and training firm located in Manchester, Connecticut. Mike is an international consultant and lecturer on the application of lean manufacturing and quality improvement techniques to manufacturing, warehousing, and distribution operations. He has successfully applied improvement techniques in companies ranging from 10-person start-up companies to Fortune 500 manufacturers. Mike has co-authored twenty-one published books and training systems on quality improvement and lean manufacturing tools including A Practical Guide to Statistical Quality Improvement published by Van Nostrand Reinhold and the highly successful SPC in Action series published by Quality Resources. Also among his works are The Basics of FMEA, published by Productivity Press, and 5S, an interactive computer-based training system on workplace organizational techniques. Mike graduated from the University of Maryland in College Park in chemical engineering and has held engineering, manufacturing, and plant management positions in the discrete parts manufacturing, plastics, and chemical process industries. As plant manager for the Rogers Corporation’s Elastomeric Products Unit, he led his site to win the Connecticut Quality Improvement Award. Winning this award was based on the results the unit achieved by integrating lean manufacturing and quality improvement techniques into its overall business approach. Mike is a registered Professional Engineer and a Certified Quality Engineer. He is an eight-time member of the Board of Examiners for NIST’s Malcolm Baldrige National Quality Award and served the two Connecticut quality awards as a senior examiner, team leader, and instructor for examiners. Mike is certified in lean implementation by the Supplier Excellence Alliance (SEA), the aerospace supply-chain consortium. While living in Japan on an extended business assignment, Mike spent half a year studying and applying the Toyota Seisan Hoshiki (Production System) with tutelage from Ohno san.

1. Introduction - "Your Order is Going to be Late" 2. Process Set-Up Reduction 3. Breakdowns 4. In-Process Downtime 5. No One to Run It 6. Supply Chain Problems – "For Want of a Nail…" 7. Managing the Effort

Erscheinungsdatum
Zusatzinfo 39 Line drawings, black and white; 39 Illustrations, black and white
Verlagsort London
Sprache englisch
Maße 178 x 254 mm
Gewicht 480 g
Themenwelt Technik Umwelttechnik / Biotechnologie
Wirtschaft Betriebswirtschaft / Management Logistik / Produktion
Wirtschaft Volkswirtschaftslehre
ISBN-10 1-032-44548-3 / 1032445483
ISBN-13 978-1-032-44548-9 / 9781032445489
Zustand Neuware
Haben Sie eine Frage zum Produkt?
Mehr entdecken
aus dem Bereich
Grundlagen - Spezialthemen - Übungen

von Hans Arnolds; Franz Heege; Carsten Röh; Werner Tussing

Buch | Softcover (2022)
Springer Gabler (Verlag)
CHF 55,95

von Wolfgang Stölzle; Dustin Schöder; Ludwig Häberle

Buch | Softcover (2024)
De Gruyter Oldenbourg (Verlag)
CHF 55,90
dynamisch und innovativ

von Ingrid Göpfert

Buch | Softcover (2024)
Vahlen (Verlag)
CHF 48,85