Nicht aus der Schweiz? Besuchen Sie lehmanns.de
Planning, Estimating, and Control of Chemical Construction Projects - Pablo F. Navarrete, William C. Cole

Planning, Estimating, and Control of Chemical Construction Projects

Buch | Hardcover
508 Seiten
2001 | 2nd edition
Crc Press Inc (Verlag)
978-0-8247-0516-9 (ISBN)
CHF 379,95 inkl. MwSt
Outlining the responsibility of the venture manager in project selection, this title contains chapters with emphasis on choosing the correct project, defining project goals, adequate front end loading (FEL). It provides case studies and examples on technical evaluation criteria, construction progress monitoring, and offshore estimating.
Contains added chapters emphasizing the importance of choosing the correct project and defining project goals. Stresses the need for adequate front end loading (FEL) and outlines the responsibility of the venture manager in project selection. Provides updated case studies and examples on technical evaluation criteria, construction progress monitoring, offshore estimating, and more. The authors discuss such topics as initial involvement and plan of action, process design, regulatory compliance, risk analysis, project execution plan/master project schedule, estimating, contracting, detailed engineering, procurement, construction management, project control, contracts administration, communications, and plant start-up.

Pablo F.Navarrete, William C. Cole

The project; the integrated team/the venture manager; project goals/choosing the right project; initial involvement and plan of action; process design - phase 0/phase 1; regulatory compliance; risk analysis; project execution plan/master project schedule; estimating; contracting; detailed engineering; procurement; construction management; project control; contracts administration; communications; plant start-up; semi-detailed estimating system; appendices - recommended reading, glossary, typical coordination procedure, estimate checklist, execution plan/MPS for case study, technical evaluation criteria example, in-house construction progress monitoring system example, construction progress monitoring - case study, forecasting final subcontract cost, heat tracing models, field indirects checklist, semi-detailed estimate example - case study, accuracy of the modified TFCF for conceptual and check estimates, offshore estimating example, plant testing, acceptance and commissioning.

Erscheint lt. Verlag 23.1.2001
Reihe/Serie Cost Engineering
Verlagsort Bosa Roca
Sprache englisch
Maße 152 x 229 mm
Gewicht 1110 g
Themenwelt Technik Bauwesen
Technik Umwelttechnik / Biotechnologie
ISBN-10 0-8247-0516-5 / 0824705165
ISBN-13 978-0-8247-0516-9 / 9780824705169
Zustand Neuware
Haben Sie eine Frage zum Produkt?
Mehr entdecken
aus dem Bereich
Bemessung von Stahlbauten nach Eurocode mit zahlreichen Beispielen

von Jörg Laumann; Christian Wolf

Buch | Hardcover (2024)
Springer Vieweg (Verlag)
CHF 83,95
Kommentar zu VOB/C ATV DIN 18340, ATV DIN 18299

von Volker Mänz; Thomas Schmid; Markus Weißert

Buch | Softcover (2024)
DIN Media (Verlag)
CHF 96,55