Nicht aus der Schweiz? Besuchen Sie lehmanns.de
Pipeline and Energy Plant Piping -  Sam Stuart

Pipeline and Energy Plant Piping (eBook)

Design and Technology

(Autor)

eBook Download: PDF | EPUB
2013 | 1. Auflage
392 Seiten
Elsevier Science (Verlag)
978-1-4831-4515-0 (ISBN)
Systemvoraussetzungen
Systemvoraussetzungen
54,95 inkl. MwSt
(CHF 53,65)
Der eBook-Verkauf erfolgt durch die Lehmanns Media GmbH (Berlin) zum Preis in Euro inkl. MwSt.
  • Download sofort lieferbar
  • Zahlungsarten anzeigen
Pipeline and Energy Plant Piping: Design and Technology covers the proceedings of an international conference, 'Pipeline and Energy Plant Piping - Fabrication in the 80's. The book covers the total spectrum of technology relevant to pipeline fabrication, design, materials, welding process, inspection, defect acceptance, performance, and project management. The text also discusses other energy systems, such as nuclear, hydroelectric, oil, and gas transmission, to understand the technological demands of energy production and distribution. The text will be of great interest to professionals such as engineers whose line of work involves the management and regulation of piping systems.

Dr. Sam Stuart is a physiotherapist and a research Fellow within the Balance Disorders Laboratory, OHSU. His work focuses on vision, cognition and gait in neurological disorders, examining how technology-based interventions influence these factors. He has published extensively in world leading clinical and engineering journals focusing on a broad range of activities such as real-world data analytics, algorithm development for wearable technology and provided expert opinion on technology for concussion assessment for robust player management. He is currently a guest editor for special issues (sports medicine and transcranial direct current stimulation for motor rehabilitation) within Physiological Measurement and Journal of NeuroEngineering and Rehabilitation, respectively.
Pipeline and Energy Plant Piping: Design and Technology covers the proceedings of an international conference, "e;Pipeline and Energy Plant Piping - Fabrication in the 80's. The book covers the total spectrum of technology relevant to pipeline fabrication, design, materials, welding process, inspection, defect acceptance, performance, and project management. The text also discusses other energy systems, such as nuclear, hydroelectric, oil, and gas transmission, to understand the technological demands of energy production and distribution. The text will be of great interest to professionals such as engineers whose line of work involves the management and regulation of piping systems.

Managing the Construction of the Alaska Highway Gas Pipeline Project


R.B. Snyder,     Alberta Gas Trunk Line, Alaska Project Division Calgary, Alberta

Publisher Summary


The Alaska Highway Gas Pipeline has been described as the largest privately financed project ever undertaken. This chapter focuses on the management of the construction of this project. The total Alaska Highway Gas Pipeline project is broken down into four major segments, each handled by a separate project team formed with the expertise needed to handle the characteristics of the particular geographic portion with which they are involved. The sponsors of the Canadian portion of the Project, Alberta Gas Trunk Line, and Westcoast Transmission are large operating companies. A pipeline project like any other major project is comprised of a number of modules. Such modules can be worked on by individual design and construction teams. In the case of a pipeline, the modules are the compressor stations and pipeline spread sections. With construction spread over six years, a reasonable loading of the Canadian pipeline construction industry can be achieved. No more than five pipeline spreads are planned to be under way at one time. While the bulk of the compressor stations will be built over the same three-year period, the stations will be constructed by relatively small work groups located in several different jurisdictions.

The Alaska Highway Gas Pipeline has been described as the largest privately financed project ever undertaken. The project is indeed large and currently quoted in the media as having a price tag of $21.7 billion. Such figures are unofficial and include the Prudhoe Bay gathering system and processing plant which have been designated by the U.S. Federal Energy Regulatory Commission as the responsibility of the North Slope producers. While large, the project is, however, basically a pipeline of a type common to the North American construction scene. It does have some unique technical aspects in the area of frost heave and pipe metallurgy, but by far the majority of the technical elements of the project embrace well established proven concepts.

Again, while large, the project is not a single monolithic entity, the construction of which will demand superhuman efforts to keep it under control. The overall project breaks down nicely into readily manageable packages which a strong management team with well planned project procedures and responsive, timely information systems can control through to on time, on budget completion.

The companies responsible for and actively directing the construction of the pipeline portions of this major gas transportation system are formed into four groups as shown in Table 1. Northwest Alaskan is sponsored by seven U.S. pipeline companies and Northern Border Pipeline by four U.S. and one Canadian pipeline company.

TABLE 1

The Alaska Highway Natural Gas Pipeline Project Sections

Overall, then the total project is broken down into four major segments, each handled by a separate project team formed with the expertise needed to handle the characteristics of the particular geographic portion with which they are involved.

The sponsors of the Canadian portion of the Project, Alberta Gas Trunk Line and Westcoast Transmission are large operating companies. At the end of 1979 these companies had combined assets of $4.2 billion (Canadian) and operated 13 129 km of natural gas transmission lines of up to 1 067 mm in diameter. The U.S. pipeline sponsors of the U.S. section, in 1978, the most recent data available, had assets of 18.8 billion U.S. dollars and together they operated 194 407 km of pipelines. All of the experience and capability of these companies is available to the project teams managing the Alaska Highway Pipeline Project.

The Canadian portion of the project, estimated to cost $8.4 billion (Canadian) in escalated dollars is similarly divided into five manageable sized sections. As well the project will be constructed in phases, an early “prebuild” phase to provide an early cash flow through the transportation of surplus Canadian gas available for export and a later mainline phase when the balance of the pipeline to carry Alaska Gas will be constructed. The combined phases will span six years with the complete project in service in late 1985.

A pipeline project like any other major project is comprized of a number of modules. Such modules can be worked on by individual design and construction teams. In the case of a pipeline the modules are the compressor stations and pipeline spread sections. For practical, detailed planning and construction management purposes each of these can be addressed individually. Our project will require 21 compressor stations to be in place by 1985. See Table 2.

TABLE 2

Compressor Stations

Plans for construction of the pipe portion of the line call for the Canadian sections to be built in 36 sections or spreads. See Table 3. In Canada, therefore, the Alaska Highway Pipeline will be constructed of 57 modules, each of a size and scope common to the construction industry in North America.

TABLE 3

Spread Allocation

With construction spread over six years a reasonable loading of the Canadian pipeline construction industry can be achieved. No more than five pipeline spreads are planned to be under way at one time. While the bulk of the compressor stations will be built over the same three year period, the stations will be constructed by relatively small work groups located in several different jurisdictions. This construction plan has been carefully tailored to fit the Canadian construction scene, to maximize the use of Canadian workers and contractors, and to reflect the trades availabilities as they actually are in Western Canada.

The first step then, in managing this major pipeline project, has been to recognize its natural geographical components and construction modules, to focus planning on them and to structure the required management organization and systems around them.

The second step was to select and develop the organization and systems required to effectively manage the project. Because of the large dollar figures involved in the project, because its construction spans six years in a period of inflation and high cost of money, because of the high public profile of the project and because it will be constructed under a unique regulatory framework, practical and timely information, accounting and scheduling systems perhaps not used previously on pipeline projects, will be required.

Information will be required on two levels: a detailed level for the day to day control of project activities by the construction management team, and at a summary level for the executive management of the project, for financing purposes and for regulatory reporting. All information must be captured and processed into usable report form in a timely manner, if it is to be put to effective use to meet the company’s objectives.

Detailed planning for the project has been underway since July, 1977 when the National Energy Board approved the Company’s application to construct on the Alaska Highway route. Currently a team of 350 people based in Calgary is continuing with the work needed for the Prebuild phase with actual construction planned to start this summer. This work force is divided about equally between Foothills (Yukon) and the Alaska Project Division, who are handling the design and construction management of the Prebuild sections in Alberta and Saskatchewan. The smaller southeastern B.C. section is being designed and managed by Alberta Natural Gas.

In preparation for the Prebuild phase, systems development at the summary or project overview level is being carried forward by the Foothills (Yukon) parent company team. At the detailed level, the needed systems have been selected and implemented by the Alaska Project Division of Alberta Gas Trunk Line. Close cooperation by the two teams has ensured that all necessary data can readily be supplied at the system interfaces.

Where possible existing software packages have been selected and purchased to minimize systems development costs and lead time. The purchased packages are installed and brought on line by the combined efforts of the systems staff of Alberta Gas Trunk Line and Foothills (Yukon). To date all computer hardware requirements of the project are being met by the Alberta Gas Trunk Line Amhdahl V 5 installation located in Calgary.

Although the subdivision of the project by section and module makes good sense from a practical management viewpoint, such an approach brings with it a need for close coordination. Close control of the numerous component activities and approvals is most important. A computer based scheduling system has been installed to assist in the control of the many items that need to be tracked and to provide the quick reporting turn around demanded by the project team.

To facilitate construction of the project and ensure that maximum benefits for Canadians are secured, the Canadian government passed the Northern Pipeline Act and established the Northern Pipeline Agency. The Agency administers the Act and the more detailed Terms and Conditions established thereunder. As well, the project is under the watchful eye of the National Energy Board and special senate and House of Commons subcommittees. This unique regulatory...

Erscheint lt. Verlag 22.10.2013
Sprache englisch
Themenwelt Naturwissenschaften Physik / Astronomie
Technik Bauwesen
Technik Elektrotechnik / Energietechnik
Technik Maschinenbau
ISBN-10 1-4831-4515-8 / 1483145158
ISBN-13 978-1-4831-4515-0 / 9781483145150
Haben Sie eine Frage zum Produkt?
PDFPDF (Adobe DRM)
Größe: 37,9 MB

Kopierschutz: Adobe-DRM
Adobe-DRM ist ein Kopierschutz, der das eBook vor Mißbrauch schützen soll. Dabei wird das eBook bereits beim Download auf Ihre persönliche Adobe-ID autorisiert. Lesen können Sie das eBook dann nur auf den Geräten, welche ebenfalls auf Ihre Adobe-ID registriert sind.
Details zum Adobe-DRM

Dateiformat: PDF (Portable Document Format)
Mit einem festen Seiten­layout eignet sich die PDF besonders für Fach­bücher mit Spalten, Tabellen und Abbild­ungen. Eine PDF kann auf fast allen Geräten ange­zeigt werden, ist aber für kleine Displays (Smart­phone, eReader) nur einge­schränkt geeignet.

Systemvoraussetzungen:
PC/Mac: Mit einem PC oder Mac können Sie dieses eBook lesen. Sie benötigen eine Adobe-ID und die Software Adobe Digital Editions (kostenlos). Von der Benutzung der OverDrive Media Console raten wir Ihnen ab. Erfahrungsgemäß treten hier gehäuft Probleme mit dem Adobe DRM auf.
eReader: Dieses eBook kann mit (fast) allen eBook-Readern gelesen werden. Mit dem amazon-Kindle ist es aber nicht kompatibel.
Smartphone/Tablet: Egal ob Apple oder Android, dieses eBook können Sie lesen. Sie benötigen eine Adobe-ID sowie eine kostenlose App.
Geräteliste und zusätzliche Hinweise

Buying eBooks from abroad
For tax law reasons we can sell eBooks just within Germany and Switzerland. Regrettably we cannot fulfill eBook-orders from other countries.

EPUBEPUB (Adobe DRM)
Größe: 15,1 MB

Kopierschutz: Adobe-DRM
Adobe-DRM ist ein Kopierschutz, der das eBook vor Mißbrauch schützen soll. Dabei wird das eBook bereits beim Download auf Ihre persönliche Adobe-ID autorisiert. Lesen können Sie das eBook dann nur auf den Geräten, welche ebenfalls auf Ihre Adobe-ID registriert sind.
Details zum Adobe-DRM

Dateiformat: EPUB (Electronic Publication)
EPUB ist ein offener Standard für eBooks und eignet sich besonders zur Darstellung von Belle­tristik und Sach­büchern. Der Fließ­text wird dynamisch an die Display- und Schrift­größe ange­passt. Auch für mobile Lese­geräte ist EPUB daher gut geeignet.

Systemvoraussetzungen:
PC/Mac: Mit einem PC oder Mac können Sie dieses eBook lesen. Sie benötigen eine Adobe-ID und die Software Adobe Digital Editions (kostenlos). Von der Benutzung der OverDrive Media Console raten wir Ihnen ab. Erfahrungsgemäß treten hier gehäuft Probleme mit dem Adobe DRM auf.
eReader: Dieses eBook kann mit (fast) allen eBook-Readern gelesen werden. Mit dem amazon-Kindle ist es aber nicht kompatibel.
Smartphone/Tablet: Egal ob Apple oder Android, dieses eBook können Sie lesen. Sie benötigen eine Adobe-ID sowie eine kostenlose App.
Geräteliste und zusätzliche Hinweise

Buying eBooks from abroad
For tax law reasons we can sell eBooks just within Germany and Switzerland. Regrettably we cannot fulfill eBook-orders from other countries.

Mehr entdecken
aus dem Bereich
Von Energie und Entropie zu Wärmeübertragung und Phasenübergängen

von Rainer Müller

eBook Download (2023)
De Gruyter (Verlag)
CHF 53,65