Nicht aus der Schweiz? Besuchen Sie lehmanns.de
New Generation Whole-Life Costing - Ian Ellingham, William Fawcett

New Generation Whole-Life Costing

Property and Construction Decision-Making Under Uncertainty
Buch | Softcover
222 Seiten
2006
Routledge (Verlag)
978-0-415-34658-0 (ISBN)
CHF 102,95 inkl. MwSt
This book presents a new approach to whole-life costing and risk management for construction. It is a pioneering transfer of the options-based approach to decision making, which has revolutionized the management of uncertainty in the financial world.
New Generation Whole-Life Costing presents an innovative approach to decision-making and risk management for construction and real estate. It applies the options-based approach that has revolutionized the management of uncertainty in the business world. Based on government-sponsored research at Cambridge Architectural Research Ltd., the book introduces the idea of 'lifecycle options'.

The desirability of whole-life costing is widely accepted, but take-up levels have been low. One problem is that traditional techniques fail to take account of future uncertainty. In contrast, the new options-based approach considers a diversity of possible futures, and favours flexible strategies that incorporate lifecycle options. This approach leads to more cost-effective and sustainable decisions, minimizing the risk of under- or over-investment.

This book is structured around realistic case studies that demonstrate the prevalence of lifecycle options. These case studies are backed up by clear presentation of basic principles and mathematical techniques allowing the book to be read either as a stimulating introduction to new concepts, or as a guide to mathematical methods.

Ian Ellingham is an associate of Cambridge Architectural Research Ltd., UK. William Fawcett has held a lectureship at the University of Hong Kong and was one of the founding directors of Cambridge Architectural Research Ltd. He holds the Chadwick Fellowship in Architecture at Pembroke College, Cambridge.

1. The Rationale for Project Evaluation 2. Evaluating Long Term Projects 3. Evaluating Risk Projects 4. Data for Whole-Life Costing 5. Lifecycle Options 6. The Option to Develop 7. The Option to Expand 8. The Option to Switch Use 9. The Option to Reconfigure 10. The Option to Refurbish 11. Options on New Technology 12. Very Long Term Projects 13. Long-Term Budgeting under Uncertainty 14. Self-Assessment Matrix for Whole-Life Evaluation. Where to Find Out More

Erscheint lt. Verlag 6.7.2006
Zusatzinfo 18 Tables, black and white; 45 Line drawings, black and white; 63 Halftones, black and white
Verlagsort London
Sprache englisch
Maße 189 x 246 mm
Gewicht 430 g
Themenwelt Naturwissenschaften Biologie Ökologie / Naturschutz
Technik Architektur
Technik Bauwesen
Wirtschaft Betriebswirtschaft / Management Rechnungswesen / Bilanzen
Betriebswirtschaft / Management Spezielle Betriebswirtschaftslehre Immobilienwirtschaft
Wirtschaft Betriebswirtschaft / Management Unternehmensführung / Management
ISBN-10 0-415-34658-4 / 0415346584
ISBN-13 978-0-415-34658-0 / 9780415346580
Zustand Neuware
Haben Sie eine Frage zum Produkt?
Mehr entdecken
aus dem Bereich
Handbuch für Studium und Praxis

von Hanspeter Gondring

Buch | Hardcover (2023)
Vahlen (Verlag)
CHF 109,95
warum Rene Benkos Immobilienimperium zusammenbrach und was dem …

von Margret Hucko; Martin Noé

Buch | Hardcover (2024)
FinanzBuch Verlag
CHF 30,80